A ceremony was held outside Belton Church on 11th November to re-dedicate the newly restored war memorial plaque and gates. A number of relatives of the Belton men who served in the Great War attended.
admin
13 posts
Fibre-to-the-Property (FTTP) broadband is set to go live in Brandon on 28 Nov 2018, with internet speeds of up to 330Mbps. Lincolnshire Council plan to provide high speed broadband to remaining properties as soon as possible. In the meantime, relatively high speed broadband is available from www.jhcs.com or www.ineedbroadband.co.uk. More information at Onlincolnshire.
The main road through Brandon is due to get a 40 mph speed limit later this year. We’re expecting more details of when the signs will be installed soon (last update Oct 2018).